Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

(Shippingport Atomic Power Station). Quarterly operating report, first quarter 1981

Technical Report ·
DOI:https://doi.org/10.2172/6338775· OSTI ID:6338775
At the beginning of the first quarter of 1981, the Shippingport Atomic Power Station was operating with the 1A, 1B, 1C, and 1D reactor coolant loops and the 1AC and 1BD purification loops in service. The 1A, 1B, and 1C 991 psig self-actuated steam relief valves remained gagged during the quarter to prevent leakage through the valve seats. The 1D steam relief valve was removed during the spring 1980 shutdown for repairs and a blind flange was installed in its place. Gagging and/or removing of redundant relief valves is permitted by ASME Code and approved operating procedures. During the quarter, the Station was operated for Duquesne Light Company System grid at maximum base load with the exception of two short duration shutdowns. The LWBR Core has generated 20,645.54 EFPH from start-up through the end of the quarter. There were no radioactive liquid discharges from the Radioactive Waste Processing System to the river this quarter.
Research Organization:
Duquesne Light Co., Shippingport, PA (USA)
DOE Contract Number:
AC11-76PN00292
OSTI ID:
6338775
Report Number(s):
DLCS-5000181
Country of Publication:
United States
Language:
English