(Shippingport Atomic Power Station). Quarterly operating report, third quarter 1981

Technical Report ·
OSTI ID:5617461
At the beginning of the third quarter of 1981, the Shippingport Atomic Power Station was operating with the 1A, 1B, 1C, and 1D reactor coolant loops and the 1AC and 1BD purification loops in service. The 1A, 1B, and 1C 991 psig self-actuated steam relief valves remained gagged during the quarter to prevent leakage through the valve seats. The 1D steam relief valve was removed during the Spring 1980 Shutdown for repairs and a blind flange was installed in its place. Gagging and/or removing of redundant relief valves is permitted by ASME Code and approved operating procedures. During the quarter, the Station was operated for Duquesne Light Company system grid at maximum base load with the exception of three short duration shutdowns and one 50% load reduction.
Research Organization:
Duquesne Light Co., Shippingport, PA (USA)
DOE Contract Number:
AC11-76PN00292
OSTI ID:
5617461
Report Number(s):
DLCS-5000381; ON: DE82006194
Country of Publication:
United States
Language:
English