Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Comparative cost estimates of five coal utilization processes

Technical Report ·
DOI:https://doi.org/10.2172/6113107· OSTI ID:6113107
Detailed capital and operating cost estimates were prepared for the generation of electric power in a new, net 500 MW (e), coal-burning facility by five alternative processes: conventional boiler with no control of SO/sub 2/ emissions, atmospheric fluidized bed steam generator (AFB), conventional boiler equipped with a limestone FGD system, conventional boiler equipped with magnesia FGD system, and coal beneficiation followed by a conventional boiler quipped with limestone FGD for part of the flue gas stream. For a coal containing 3.5% sulfur, meeting SO/sub 2/ emission limits of 1.2 pounds per million Btu fired was most economical with the limestone FGD system. This result was unchanged for a coal containing 5% sulfur; however, for 2% sulfur, limestone FGD and AFB were competitive methods of controlling SO/sub 2/ emissions. Brief consideration of 90% reduction of SO/sub 2/ emissions led to the choice of limestone FGD as the most economical method. Byproduct credit for the sulfuric acid produced in regenerating the magnesia could make that system competitive with the limestone FGD system, depending upon local markets. The cost of sludge fixation and disposal would make limestone FGD noneconomic in many situations, if these steps are necessary.
Research Organization:
Chem Systems, Inc., New York (USA)
DOE Contract Number:
W-7405-ENG-26
OSTI ID:
6113107
Report Number(s):
ORNL/Sub-7384/1
Country of Publication:
United States
Language:
English

Similar Records

Fluidized-bed combustion: effectiveness of an SO/sub 2/ control technology for industrial boilers. Final report
Technical Report · Sat Sep 01 00:00:00 EDT 1984 · OSTI ID:5418105

Coal-cleaning options for SO/sub 2/ emission reduction
Technical Report · Thu Feb 28 23:00:00 EST 1985 · OSTI ID:5579746

Adipic acid enhanced flue gas desulfurization process for industrial boilers. Volume 2. Technical assessment. Project summary
Technical Report · Mon Feb 28 23:00:00 EST 1983 · OSTI ID:5474227