Small-Scale Hydroelectric Power Demonstration Project: Turlock Irrigation District Drop No. 1 power plant. Final technical and construction cost report
Technical Report
·
OSTI ID:6060663
This report describes the major technical steps undertaken in the development of the Turlock Lake Powerhouse and identifies the considerations involved and the problems encountered during the course of the project. Covered are: site selection and operational considerations, planning, regulatory approvals, turbogenerator, construction, cost, and drawings.
- Research Organization:
- Turlock Irrigation District, CA (USA)
- DOE Contract Number:
- FC07-79RA23215
- OSTI ID:
- 6060663
- Report Number(s):
- DOE/RA-23215; ON: DE83015148
- Country of Publication:
- United States
- Language:
- English
Similar Records
Turlock Irrigation District Drop No. 1 Power Plant: Final operation and maintenance report. Small-scale hydroelectric-power demonstration project
Turlock Lake Powerhouse. Turlock Irrigation District design report and operations manual
Small-Scale Hydroelectric Power Demonstration Project: reactivation of the Elk Rapids Hydroelectric Facility. Final technical and construction cost report
Technical Report
·
Thu Mar 31 23:00:00 EST 1983
·
OSTI ID:6373352
Turlock Lake Powerhouse. Turlock Irrigation District design report and operations manual
Technical Report
·
Wed Dec 31 23:00:00 EST 1980
·
OSTI ID:6782882
Small-Scale Hydroelectric Power Demonstration Project: reactivation of the Elk Rapids Hydroelectric Facility. Final technical and construction cost report
Technical Report
·
Wed May 01 00:00:00 EDT 1985
·
OSTI ID:5501150