Small-Scale Hydroelectric Power Demonstration Project: reactivation of the Elk Rapids Hydroelectric Facility. Final technical and construction cost report
Technical Report
·
OSTI ID:5501150
The Elk Rapids powerhouse dam is located on the Elk River channel in the Village of Elk Rapids, Michigan. Together with a small spillway structure located approximately 500 ft south of the dam, it constitutes the outlet to Lake Michigan for Elk Lake, Skegemog Lake, Torch Lake, Lake Bellaire, Clam Lake, and several smaller lakes. Power has been generated at the Elk Rapids site since the late nineteenth century, but the history of the present facility goes back to 1916 with the construction of the existing powerhouse dam by the Elk Rapids Iron Works Company. The facility was designed to contain four vertical-shaft generating units; however, only a single 270 hp Leffel type K unit was installed in 1916. In 1929, two additional Leffel units, rated 525 hp, were installed, and in 1930 a third 525 hp Leffel unit was added completely utilizing the capacity of the powerhouse and bringing the combined turbine capacity to 1845 hp.
- Research Organization:
- Ayres, Lewis, Norris and May, Inc., Ann Arbor, MI (USA)
- DOE Contract Number:
- FC07-79RA23209
- OSTI ID:
- 5501150
- Report Number(s):
- DOE/RA/23209-T2; ON: DE85013807
- Country of Publication:
- United States
- Language:
- English
Similar Records
Hydroelectric feasibility study: Chubb River Sites, Village of Lake Placid, New York
Foote Hydroelectric Plant spillway rehabilitation
Estimate of national hydroelectric power potential at existing dams
Technical Report
·
Sun Dec 31 23:00:00 EST 1978
·
OSTI ID:5690861
Foote Hydroelectric Plant spillway rehabilitation
Conference
·
Tue Oct 01 00:00:00 EDT 1996
·
OSTI ID:376182
Estimate of national hydroelectric power potential at existing dams
Book
·
Wed Jul 20 00:00:00 EDT 1977
·
OSTI ID:5758227