Coal-Fired MHD Combustor Development Project: Phase IIID. Third quarterly technical progress report, November 1, 1984-January 31, 1985
Technical Report
·
OSTI ID:6038866
This third quarterly technical progress report of the Coal-Fired MHD Combustor Development Project (Phase IIID) presents the accomplishments during the period 1 November 1984 to 31 January 1985. The scope encompasses development work on the 50 MW/sub t/ combustor related to test support at the CDIF, fabrication and assembly of first and second stoge hardware, plans for second stage design vertification testing and power testing, and designs for a continuous slag rejector and low preheat inlet section. Progress included the following: Operational verification testing of the first stage at the CDIF was completed (A total of 38 tests were conducted); assembly and checkout of the second first stage, two second stages, and PEM was 75 to 90% completed; conceptual designs for a continuous slag rejector and low preheat inlet section were completed and low preheat preliminary design work was 75% completed; and revision of the Users' Manual to include the second stage was 75% completed and a draft Test Plan for power train testing was prepared and reviewed. 13 figures, 7 tables.
- Research Organization:
- TRW Energy Development Group, Redondo Beach, CA (USA)
- DOE Contract Number:
- AC22-84PC70508
- OSTI ID:
- 6038866
- Report Number(s):
- DOE/PC/70508-T2; ON: DE85008822
- Country of Publication:
- United States
- Language:
- English
Similar Records
Coal-fired MHD combustor development project: Phase IIID. Fourth quarterly technical progress report, 1 February-30 April 1985
Coal-Fired MHD Combustor Development Project: Phase IIID. Seventh quarterly technical progress report, 1 November 1985-31 January 1986
Coal-Fired MHD Combustor Development Project: Phase IIID. First quarterly technical progress report
Technical Report
·
Mon May 20 00:00:00 EDT 1985
·
OSTI ID:5382325
Coal-Fired MHD Combustor Development Project: Phase IIID. Seventh quarterly technical progress report, 1 November 1985-31 January 1986
Technical Report
·
Wed Feb 19 23:00:00 EST 1986
·
OSTI ID:6252270
Coal-Fired MHD Combustor Development Project: Phase IIID. First quarterly technical progress report
Technical Report
·
Mon Aug 20 00:00:00 EDT 1984
·
OSTI ID:6773336