Coal-fired MHD combustor development project: Phase IIID. Fourth quarterly technical progress report, 1 February-30 April 1985
Technical Report
·
OSTI ID:5382325
This fourth quarterly technical progress report of the Coal-Fired MHD Combustor Development Project (Phase IIID) presents the accomplishments during the period February 1 to April 30, 1985. The scope of work covered by this quarterly report encompasses development work on the 50 MW/sub t/ combustor related to test support at the CDIF, assembly and checkout of first and second stage hardware, second stage design verification testing, designs for a continuous slag rejector and low preheat inlet section, and planning for power train testing. Progress includes the following: assembly and checkout of the second first stage, two second stages, and PEM was completed and the hardware was shipped to CDIF and FETS; integration of first and second stage hardware on the FETS Cell No. 2 test stand was completed, cold flow functional tests were performed, and hot fire checkout testing was initiated; assembly of the continuous slag rejector test set-up was 70% completed; the low preheat air inlet section Preliminary Design Review was held (work on the detail design was initiated and is 85% complete); and the Users' Manual was updated to include material for the second stage and final revisions to the power train test plan were made.
- Research Organization:
- TRW Space and Technology Group, Redondo Beach, CA (USA). Energy Div.
- DOE Contract Number:
- AC22-84PC70508
- OSTI ID:
- 5382325
- Report Number(s):
- MHD-III-85-037; ON: DE85014459
- Country of Publication:
- United States
- Language:
- English
Similar Records
Coal-Fired MHD Combustor Development Project: Phase IIID. Third quarterly technical progress report, November 1, 1984-January 31, 1985
Coal-Fired MHD Combustor Development Project: Phase IIID. Seventh quarterly technical progress report, 1 November 1985-31 January 1986
Coal-Fired MHD Combustor Development Project: Phase IIID. Second quarterly technical progress report, 1 August-31 October 1984
Technical Report
·
Tue Feb 19 23:00:00 EST 1985
·
OSTI ID:6038866
Coal-Fired MHD Combustor Development Project: Phase IIID. Seventh quarterly technical progress report, 1 November 1985-31 January 1986
Technical Report
·
Wed Feb 19 23:00:00 EST 1986
·
OSTI ID:6252270
Coal-Fired MHD Combustor Development Project: Phase IIID. Second quarterly technical progress report, 1 August-31 October 1984
Technical Report
·
Mon Nov 19 23:00:00 EST 1984
·
OSTI ID:6125914