Coal-fired MHD combustor development project: Phase IIID. Fourth quarterly technical progress report, 1 February-30 April 1985

Technical Report ·
OSTI ID:5382325
This fourth quarterly technical progress report of the Coal-Fired MHD Combustor Development Project (Phase IIID) presents the accomplishments during the period February 1 to April 30, 1985. The scope of work covered by this quarterly report encompasses development work on the 50 MW/sub t/ combustor related to test support at the CDIF, assembly and checkout of first and second stage hardware, second stage design verification testing, designs for a continuous slag rejector and low preheat inlet section, and planning for power train testing. Progress includes the following: assembly and checkout of the second first stage, two second stages, and PEM was completed and the hardware was shipped to CDIF and FETS; integration of first and second stage hardware on the FETS Cell No. 2 test stand was completed, cold flow functional tests were performed, and hot fire checkout testing was initiated; assembly of the continuous slag rejector test set-up was 70% completed; the low preheat air inlet section Preliminary Design Review was held (work on the detail design was initiated and is 85% complete); and the Users' Manual was updated to include material for the second stage and final revisions to the power train test plan were made.
Research Organization:
TRW Space and Technology Group, Redondo Beach, CA (USA). Energy Div.
DOE Contract Number:
AC22-84PC70508
OSTI ID:
5382325
Report Number(s):
MHD-III-85-037; ON: DE85014459