Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

National Waste Terminal Storage Program. Progress report, May 1977

Technical Report ·
OSTI ID:60216
Status reports are given on the following studies: Gulf Coast salt domes; East Coast Triassic Shale Basin and Gulf Coast clays; volcanic rocks; crystalline rocks; Pierre shale; geologic studies at the Nevada Test Site; heat transfer/thermal analysis; waste/rock interaction; rock mechanics; borehole plugging; safety and reliability studies, shale and clay mineral studies; and data management. Engineering projects reported on include shale in-situ tests, dome salt in-situ tests, cooperative field testing in Sweden, and Nevada Test Site in-situ tests. Design studies of canister transporter, canister emplacement hole drilling, cask scoping study, and SNM assay and accountability. Progress in conceptual design of NWTS repositories 1 and 2 is discussed. Status of the planning and analysis project is given. (LK)
Research Organization:
Union Carbide Corp., Oak Ridge, TN (United States). Office of Waste Isolation
DOE Contract Number:
W-7405-ENG-26
OSTI ID:
60216
Report Number(s):
Y/OWI/TM--45/8
Country of Publication:
United States
Language:
English