Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Placement of the radiochemical processing plant at Oak Ridge National Laboratory into a safe standby condition

Conference ·
OSTI ID:5967124
Extensive upgrade, cleanup, and decontamination efforts are being conducted for appropriate areas in the Radiochemical Processing Plant (RPP) with the goal of achieving ''safe standby'' condition by the end of FY 1989. The ventilation system must maintain containment; thus, it is being upgraded via demolition and replacement of marginally adequate ductwork, fans, and control systems. Areas that are being decontaminated and stripped of various services (e.g., piping, ductwork, and process tanks) include hot cells, makeup rooms, and pipe tunnels. Operating equipment that is being decontaminated includes glove boxes and hoods. Replacement of the ventilation system and removal of equipment from pipe tunnels, cells, and makeup rooms are accomplished by contact labor by workers using proper attire, safety rules, and shielding. Removal of contaminated ductwork and piping is conducted with containment enclosures that are strategically located at breakpoints, and methods of separation are chosen to conform with health physics requirements. The methods of cutting contaminated piping and ductwork include portable reciprocating saws, pipe cutters, burning, and plasma torch. Specially designed containment enclosures will be used to prevent the spread of radioactive contamination while maintaining adequate ventilation. 6 figs.
Research Organization:
Oak Ridge National Lab., TN (USA)
DOE Contract Number:
AC05-84OR21400
OSTI ID:
5967124
Report Number(s):
CONF-860203-17; ON: DE86008991
Country of Publication:
United States
Language:
English