Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Feasibility determination of low head hydroelectric power development at existing sites: Mousam River Project

Technical Report ·
DOI:https://doi.org/10.2172/5901682· OSTI ID:5901682
The technical and economic feasibility of low head hydroelectric power development at existing sites along the Mousam River in southeastern Maine was studied. The following areas were investigated: determination of available energy; development of restoration concepts; environmental studies; historical and archeological studies; assessment of civil construction requirements; geotechnical and geologic assessment of existing dams; assessment of turbine alternatives; assessment of generator and utility interface alternatives; economic analysis; and restoration concept evaluation and selection. The results of the hydropower evaluation showed that: of the seven sites evaluated, only four can be considered economically feasible for refurbishment at this time; the use of used and/or rebuilt equipment is more economically attractive than new equipment; the cost of equipment at each site was of the same order as the cost of the dam reconstruction; and the cost of fuel prices will be the determining feature of whether the sites should be reconstructed.
Research Organization:
Foster-Miller Associates, Inc., Waltham, MA (USA)
OSTI ID:
5901682
Report Number(s):
DOE/ID/01777-1
Country of Publication:
United States
Language:
English