Feasibility of low head hydroelectric development at High Falls State Park, Monroe County, Georgia
The overall objectives of this project were to: assess the feasibility of a hydropower facility at High Falls State Park in Georgia from technical, environmental, and economic viewpoints; assess the economic, environmental, social, institutional, and marketing constraints and impacts that affect the development of a hydropower facility; prepare a set of conceptual design drawings and specifications concerning the facility, distribution system, location, equipment size, duty cycle, and other performance parameters; develop a construction schedule with estimated costs; and prepare a report that provides the basis for a design proposal for the facility implementation. The three sites that were considered are technically and economically feasible; but only the proposed site at the dam is environmentally feasible. Therefore, this site would normally be recommended for implementation. However, several institutional issues exist that must be addressed in more detail and resolved before a final recommendation can be made. For the proposed site, the following major conclusions are listed: the site is technically feasible; hydroelectric equipment is available to satisfy the design requirement; construction will not present a major problem; a feasible arrangement is possible for the consumption of all produced power; operation of other park activities will be minimally disrupted; both visual and operational constraints are within the state guidelines; and the benefits are greater than the costs and, thus, the facility is economically feasible.
- Research Organization:
- Georgia Dept. of Natural Resources, Atlanta (USA); Georgia Inst. of Tech., Atlanta (USA); Cadre Corp., Atlanta, GA (USA)
- OSTI ID:
- 5858705
- Report Number(s):
- DOE/ID/01762-1
- Country of Publication:
- United States
- Language:
- English
Similar Records
Case study analysis of legal and institutional obstacles and incentives to the potential hydroelectric development at High Falls State Park, Georgia
Feasibility determination of low head hydroelectric power development at existing sites: Mousam River Project
Regional hydroelectric reclamation
Technical Report
·
Thu May 01 00:00:00 EDT 1980
·
OSTI ID:5167650
Feasibility determination of low head hydroelectric power development at existing sites: Mousam River Project
Technical Report
·
Fri Jun 01 00:00:00 EDT 1979
·
OSTI ID:5901682
Regional hydroelectric reclamation
Technical Report
·
Wed Dec 31 23:00:00 EST 1975
·
OSTI ID:6163416
Related Subjects
13 HYDRO ENERGY
130100* -- Hydro Energy-- Resources & Availability
DAMS
ECONOMICS
ELECTRIC POWER
ENERGY SOURCES
ENVIRONMENTAL IMPACTS
FEASIBILITY STUDIES
GEORGIA
HYDROELECTRIC POWER
HYDROELECTRIC POWER PLANTS
LEGAL ASPECTS
LOW-HEAD HYDROELECTRIC POWER PLANTS
NORTH AMERICA
POWER
POWER GENERATION
POWER PLANTS
RENEWABLE ENERGY SOURCES
RETROFITTING
SOUTHEAST REGION
TECHNOLOGY ASSESSMENT
USA
130100* -- Hydro Energy-- Resources & Availability
DAMS
ECONOMICS
ELECTRIC POWER
ENERGY SOURCES
ENVIRONMENTAL IMPACTS
FEASIBILITY STUDIES
GEORGIA
HYDROELECTRIC POWER
HYDROELECTRIC POWER PLANTS
LEGAL ASPECTS
LOW-HEAD HYDROELECTRIC POWER PLANTS
NORTH AMERICA
POWER
POWER GENERATION
POWER PLANTS
RENEWABLE ENERGY SOURCES
RETROFITTING
SOUTHEAST REGION
TECHNOLOGY ASSESSMENT
USA