Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Status of DOI/BuRec SVU-1 wind turbine project

Conference · · Proc., Intersoc. Energy Convers. Eng. Conf.; (United States)
OSTI ID:5844016
The Hamilton Standard four-megawatt wind turbine has been in successful operation for over one and one-half years in Medicine Bow, Wyoming. This unit, currently the world's most powerful wind turbine, was installed for the Department of Interior, Bureau of Reclamation (DOI/BuRec), as the System Verification Unit (SVU) to determine if wind energy systems can operate feasibly in conjunction with BuRec's existing hydroelectric systems.
Research Organization:
United Technologies Corporation, Hamilton Standard Division, Windsor Locks, Connecticut
OSTI ID:
5844016
Report Number(s):
CONF-840804-
Conference Information:
Journal Name: Proc., Intersoc. Energy Convers. Eng. Conf.; (United States) Journal Volume: 4
Country of Publication:
United States
Language:
English