WTS-4 wind turbine test program. Final report

Technical Report ·
OSTI ID:5751012
A summary of activity and results for a test project on the WTS-4 wind turbine, sited at Medicine Bow, Wyoming, is provided. The project was jointly funded by the Electric Power Research Institute and Hamilton Standard. The objectives of the project were to: (1) develop an improved understanding of wind turbine technology; (2) evolve wind turbine test methods and capabilities; and (3) help EPRI identify research activities that promote the evolution and use of utility grade wind power stations. The 4-megawatt WTS-4, designed and developed by Hamilton Standard, is owned by the US Bureau of Reclamation. It was erected in the fall of 1982 and by the end of 1983 had generated approximately 1500 megawatt hours. Significant operational events that occurred during the first full year of operation are reviewed.
Research Organization:
United Technologies Corp., Windsor Locks, CT (USA). Hamilton Standard Div.
OSTI ID:
5751012
Report Number(s):
EPRI-AP-4054; ON: TI85920829
Country of Publication:
United States
Language:
English

Similar Records

Installation, checkout, and early operational testing of the Hamilton Standard 4-megawatt wind turbine system (WTS-4)
Conference · Mon Aug 01 00:00:00 EDT 1983 · Proc., Intersoc. Energy Convers. Eng. Conf.; (United States) · OSTI ID:5447763

Status of DOI/BuRec SVU-1 wind turbine project
Conference · Wed Aug 01 00:00:00 EDT 1984 · Proc., Intersoc. Energy Convers. Eng. Conf.; (United States) · OSTI ID:5844016

Lessons learned and trends in U. S. megawatt-scale wind turbine development
Conference · Wed Aug 01 00:00:00 EDT 1984 · Proc., Intersoc. Energy Convers. Eng. Conf.; (United States) · OSTI ID:5733247