Feasibility study for the construction of a new LNG receiving terminal. Turkey. Volume 1. Export trade information. [LNG (liquified natural gas)]
The report was prepared by The M. W. Kellogg Co. for BOTAS Petroleum Pipeline Corporation of Ankara, Turkey. The study was undertaken to evaluate the cost and economics of constructing a second liquified natural gas (LNG) terminal in Turkey to meet future requirements for natural gas. Volume 1 is divided into the following sections: (1) Introduction; (2) Summary and Conclusions; (3) Design Basis; (4) Site Evaluation; (5) LNG Terminal Design; (6) Major Equipment and Instrumentation; (7) Marine Operations; (8) Safety Considerations; (9) Environmental Review; (10) Preliminary Project Execution Strategy; (11) Cost Estimates; (12) Project Master Schedule; (13) Economic Analysis; (14) Financing; (15) Future Work.
- Research Organization:
- Pullman Kellogg, Houston, TX (United States)
- OSTI ID:
- 5781296
- Report Number(s):
- PB-94-107174/XAB
- Resource Relation:
- Other Information: This document was provided to NTIS by the U.S. Trade and Development Program, Rosslyn, VA. See also Volume 2, PB--94-107091
- Country of Publication:
- United States
- Language:
- English
Similar Records
Northern Adriatic LNG receiving terminal: Pre-feasibility study. Part 1. Export trade information
The evaluation of proposed offshore LNG receiving terminals
Related Subjects
LIQUEFIED NATURAL GAS
TERMINAL FACILITIES
FEASIBILITY STUDIES
COST ESTIMATION
ECONOMIC ANALYSIS
ENVIRONMENTAL IMPACTS
EXPORTS
FINANCING
NATURAL GAS DISTRIBUTION SYSTEMS
PLANNING
SAFETY
SITE CHARACTERIZATION
TASK SCHEDULING
TURKEY
ASIA
DATA PROCESSING
DEVELOPING COUNTRIES
ECONOMICS
ENERGY SOURCES
ENERGY SYSTEMS
FLUIDS
FOSSIL FUELS
FUEL GAS
FUELS
GAS FUELS
GASES
LIQUEFIED GASES
MIDDLE EAST
NATURAL GAS
PROCESSING
TRADE
030600* - Natural Gas- Economic
Industrial
& Business Aspects
032000 - Natural Gas- Transport
Handling
& Storage