skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Northern Adriatic LNG receiving terminal: Pre-feasibility study. Part 1. Export trade information

Technical Report ·
OSTI ID:7152034

The study evaluated 2 potential sites as the location for a Liquefied Natural Gas (LNG) receiving terminal. The study assumed that the LNG will be obtained in Algeria and transported, via liquefied gas carriers, to either Koper or Omisalj, located on the Northern Adriatic coast of Yugoslavia. The proposed terminal will provide natural gas, via pipeline, to Austria, Czechoslovakia, Hungary and Yugoslavia. The goal of the study was to determine specific transportation and processing costs, per cubic meter of gas, at each delivery station in Yugoslavia and at the respective custody transfer points. Consideration has been given to the overall costs for construction, maintenance and operation, as well as marine transport for the gas and capital equipment of the system.

OSTI ID:
7152034
Report Number(s):
PB-92-208289/XAB
Resource Relation:
Other Information: This document was provided to NTIS by the U.S. Trade and Development Program, Rosslyn, VA
Country of Publication:
United States
Language:
English