Draft Supplement to the Environmental Statement Fiscal Year 1975 Proposed Program : Facility Location Evaluation for Hanford No. 2 Integrating Transmission : Ashe-Hanford 500 KV Transmission Line Study Area 74-3.
Technical Report
·
OSTI ID:5779635
Proposed construction of a 17.8-mile 500-kV single-circuit line running from BPA's Ashe Substation Site near the Hanford No. 2 nuclear power plant site to the existing Hanford Switching Station. This facility would be located entirely within the Hanford Reservation of the Atomic Energy Commission north of the City of Richland in Benton County, Washington. Construction of the proposed transmission line would require a total right-of-way easement of approximately 612 acres through grassland. That area actually occupied by the tower footings would be removed from rangeland uses. Disturbance of game in the immediate vicintiy of the route will occur during construction as will some soil erosion primarily during and immediately after construction, siltation in nearby streams, distrubance of nearby residents from noise and dust during construction, and some degradation of AM reception immediately adjacent to the right-of-way. 10 figs.
- Research Organization:
- Bonneville Power Administration, Portland, OR (USA)
- OSTI ID:
- 5779635
- Report Number(s):
- DES-74-25; ON: DE85014197
- Country of Publication:
- United States
- Language:
- English
Similar Records
Draft Supplement to the Environmental Statement Fiscal Year 1975 Proposed Program : Facility Location Evaluation for Raver-Tacoma 500-kV Transmission Line, Study Area 74-5.
Draft Supplement to the Environmental Statement Fiscal Year 1975 Proposed Program : Facility Location Evaluation for San Juan Island Service : Decatur Land Line and East Lopez Island Substation Study Area 74-7.
Draft Supplement to the Environmental Statement Fiscal Year 1975 Proposed Program : Facility Location Evaluation for Richland Area Electrical Service.
Technical Report
·
Fri Feb 15 00:00:00 EDT 1974
·
OSTI ID:5120459
Draft Supplement to the Environmental Statement Fiscal Year 1975 Proposed Program : Facility Location Evaluation for San Juan Island Service : Decatur Land Line and East Lopez Island Substation Study Area 74-7.
Technical Report
·
Fri Mar 08 00:00:00 EDT 1974
·
OSTI ID:5558873
Draft Supplement to the Environmental Statement Fiscal Year 1975 Proposed Program : Facility Location Evaluation for Richland Area Electrical Service.
Technical Report
·
Mon Dec 31 23:00:00 EST 1973
·
OSTI ID:5610045
Related Subjects
29 ENERGY PLANNING, POLICY, AND ECONOMY
290300 -- Energy Planning & Policy-- Environment
Health
& Safety
530200* -- Environmental-Social Aspects of Energy Technologies-- Assessment of Energy Technologies-- (-1989)
ANIMALS
BONNEVILLE POWER ADMINISTRATION
CLIMATES
CONSTRUCTION
ECOSYSTEMS
ENVIRONMENTAL IMPACTS
ENVIRONMENTAL QUALITY
EROSION
FEDERAL REGION X
GEOLOGY
HANFORD RESERVATION
HYDROLOGY
INSTITUTIONAL FACTORS
LAND USE
NATIONAL ORGANIZATIONS
NORTH AMERICA
Overhead electric lines - Environmental aspects
PLANTS
POWER TRANSMISSION LINES
RANGELANDS
SOCIO-ECONOMIC FACTORS
STREAMS
SURFACE WATERS
TERRESTRIAL ECOSYSTEMS
US DOE
US ERDA
US ORGANIZATIONS
USA
WASHINGTON
WATER QUALITY
290300 -- Energy Planning & Policy-- Environment
Health
& Safety
530200* -- Environmental-Social Aspects of Energy Technologies-- Assessment of Energy Technologies-- (-1989)
ANIMALS
BONNEVILLE POWER ADMINISTRATION
CLIMATES
CONSTRUCTION
ECOSYSTEMS
ENVIRONMENTAL IMPACTS
ENVIRONMENTAL QUALITY
EROSION
FEDERAL REGION X
GEOLOGY
HANFORD RESERVATION
HYDROLOGY
INSTITUTIONAL FACTORS
LAND USE
NATIONAL ORGANIZATIONS
NORTH AMERICA
Overhead electric lines - Environmental aspects
PLANTS
POWER TRANSMISSION LINES
RANGELANDS
SOCIO-ECONOMIC FACTORS
STREAMS
SURFACE WATERS
TERRESTRIAL ECOSYSTEMS
US DOE
US ERDA
US ORGANIZATIONS
USA
WASHINGTON
WATER QUALITY