Apple Grove test lines energized at 775 kV
Journal Article
·
· Westinghouse Eng.; (United States)
OSTI ID:5752818
The ehv test transmission line at Apple Grove was energized in June 1961 at 775 kV. Prime objective of the project is to obtain data on corona loss and radio influence performance of conductors at a nominal voltage of 750 kV to determine the technical and economic feasibility of transmitting large blocks of power at this extra high voltage. The article includes a sketch of the physical layout of the project. Some details of the line and tests are given.
- OSTI ID:
- 5752818
- Journal Information:
- Westinghouse Eng.; (United States), Journal Name: Westinghouse Eng.; (United States) Vol. 21; ISSN WNHEA
- Country of Publication:
- United States
- Language:
- English
Similar Records
750 kV power transmission: test line, Apple Grove, WV
Apple Grove's five year ehv feasibility study
Apple Grove 750 kV project: progress report
Journal Article
·
Sun Oct 01 00:00:00 EDT 1961
· Mech. Eng.; (United States)
·
OSTI ID:5664859
Apple Grove's five year ehv feasibility study
Journal Article
·
Tue Aug 01 00:00:00 EDT 1961
· Power Eng.; (United States)
·
OSTI ID:5556293
Apple Grove 750 kV project: progress report
Journal Article
·
Mon Dec 31 23:00:00 EST 1962
· Proc. Am. Power Conf.; (United States)
·
OSTI ID:5595943
Related Subjects
200301* -- Power Transmission & Distribution-- AC Systems
EHV & UHV-- (-1989)
24 POWER TRANSMISSION AND DISTRIBUTION
AC SYSTEMS
CORONA DISCHARGES
EHV AC SYSTEMS
ELECTRIC CONDUCTORS
ELECTRIC DISCHARGES
ELECTROMAGNETIC RADIATION
NOISE
OPERATION
POWER SYSTEMS
POWER TRANSMISSION LINES
RADIATIONS
RADIO NOISE
RADIOWAVE RADIATION
TECHNOLOGY ASSESSMENT
TEST FACILITIES
EHV & UHV-- (-1989)
24 POWER TRANSMISSION AND DISTRIBUTION
AC SYSTEMS
CORONA DISCHARGES
EHV AC SYSTEMS
ELECTRIC CONDUCTORS
ELECTRIC DISCHARGES
ELECTROMAGNETIC RADIATION
NOISE
OPERATION
POWER SYSTEMS
POWER TRANSMISSION LINES
RADIATIONS
RADIO NOISE
RADIOWAVE RADIATION
TECHNOLOGY ASSESSMENT
TEST FACILITIES