Apple Grove's five year ehv feasibility study
Journal Article
·
· Power Eng.; (United States)
OSTI ID:5556293
When the ehv test transmission line at Apple Grove, West Virginia, was energized on June 22 at 775 kV, it marked the start of a five year research and test program in which power engineers expect to determine the technical and economic feasibility of bulk power transfer at voltages up to 750 kV. Prime objective is to obtain data on corona loss and radio influence performance of conductors at 750 kV nomina. Special features allow simultaneous independent RI readings to be taken on each of the three lines.
- OSTI ID:
- 5556293
- Journal Information:
- Power Eng.; (United States), Journal Name: Power Eng.; (United States) Vol. 65; ISSN POENA
- Country of Publication:
- United States
- Language:
- English
Similar Records
Apple Grove test lines energized at 775 kV
750 kV power transmission: test line, Apple Grove, WV
Apple Grove 750 kV project: progress report
Journal Article
·
Tue Oct 31 23:00:00 EST 1961
· Westinghouse Eng.; (United States)
·
OSTI ID:5752818
750 kV power transmission: test line, Apple Grove, WV
Journal Article
·
Sun Oct 01 00:00:00 EDT 1961
· Mech. Eng.; (United States)
·
OSTI ID:5664859
Apple Grove 750 kV project: progress report
Journal Article
·
Mon Dec 31 23:00:00 EST 1962
· Proc. Am. Power Conf.; (United States)
·
OSTI ID:5595943
Related Subjects
200301* -- Power Transmission & Distribution-- AC Systems
EHV & UHV-- (-1989)
24 POWER TRANSMISSION AND DISTRIBUTION
AC SYSTEMS
CORONA DISCHARGES
EHV AC SYSTEMS
ELECTRIC CONDUCTORS
ELECTRIC DISCHARGES
ELECTROMAGNETIC RADIATION
FEASIBILITY STUDIES
NOISE
POWER SYSTEMS
POWER TRANSMISSION LINES
RADIATIONS
RADIO NOISE
RADIOWAVE RADIATION
TESTING
EHV & UHV-- (-1989)
24 POWER TRANSMISSION AND DISTRIBUTION
AC SYSTEMS
CORONA DISCHARGES
EHV AC SYSTEMS
ELECTRIC CONDUCTORS
ELECTRIC DISCHARGES
ELECTROMAGNETIC RADIATION
FEASIBILITY STUDIES
NOISE
POWER SYSTEMS
POWER TRANSMISSION LINES
RADIATIONS
RADIO NOISE
RADIOWAVE RADIATION
TESTING