Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Design of surface facilities for Khuff gas

Journal Article · · SPE (Society of Petroleum Engineers) Product. Eng.; (United States)
DOI:https://doi.org/10.2118/13683-PA· OSTI ID:5485367

Although it was discovered in 1947, commercial exploitation of the Bahrain Khuff reservoir began in 1970. Current gas demand stands at 580 MMscf/D (16.4 x 10/sup 6/ std m/sup 3//d) and is growing rapidly. This paper briefly discusses the evolution of the design for surface facilities and field experience. The established design parameters could be used for the design of surface facilities for similar reservoirs.

Research Organization:
Bahrain National Oil Co.
OSTI ID:
5485367
Journal Information:
SPE (Society of Petroleum Engineers) Product. Eng.; (United States), Journal Name: SPE (Society of Petroleum Engineers) Product. Eng.; (United States) Vol. 1:4; ISSN SPENE
Country of Publication:
United States
Language:
English