Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Cove Point LNG terminal: its first year of operation

Conference · · U.N. Econ. Comm. Eur. Comm. Gas 'LNG Peakshaving' Semin. Pap.; (United States)
OSTI ID:5468102

As of mid-Nov. 1978, the Cove Point LNG terminal, jointly owned by Columbia LNG Corp. and Consolidated System LNG Co., has received 13 shiploads of LNG from Algeria, delivering 30 billion cu ft of gas to regional distribution systems without significant operating or safety problems. Although the terminal has not yet reached its design throughput, performance has been very satisfactory. Although the project required nearly $3 billion for liquefaction, shipping, receiving, and regasification facilities, the gas will enter distribution mains at only $1.89/million Btu.

OSTI ID:
5468102
Report Number(s):
CONF-790309-
Journal Information:
U.N. Econ. Comm. Eur. Comm. Gas 'LNG Peakshaving' Semin. Pap.; (United States), Journal Name: U.N. Econ. Comm. Eur. Comm. Gas 'LNG Peakshaving' Semin. Pap.; (United States) Vol. SEM.5/R.13
Country of Publication:
United States
Language:
English

Similar Records

LNG terminal will ease gas shortage. [Cove Point, Maryland]
Conference · Mon Jun 21 00:00:00 EDT 1976 · Oil Gas J.; (United States) · OSTI ID:7153318

Two firms propose LNG imports from Iran
Journal Article · Mon Aug 21 00:00:00 EDT 1978 · Chem. Eng. News; (United States) · OSTI ID:6909177

Cove Point: A step back into the LNG business
Journal Article · Sat Dec 30 23:00:00 EST 1995 · American Gas · OSTI ID:160813