Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Brief reconnaissance study for the addition of hydropower for Riegel Dam, Trion, Georgia

Technical Report ·
OSTI ID:5358738
The feasibility of retrofitting the Riegel Dam near Trion, Georgia for power generation was examined. This dam has a developable head of 17 ft., was built in 1900 for supplying hydroelectric power for a textile mill, and currently provides cooling water to the mill. The study of environmental, institutional, safety and economic factors showed that hydroelectric power development at this site would require new generating equipment and that such retrofitting appears to be economically feasible. (LCL)
Research Organization:
Gebhard (Thomas G.), Austin, TX (USA)
DOE Contract Number:
AC44-80R420006
OSTI ID:
5358738
Report Number(s):
DOE/R4/20006-T1; ON: DE82017271
Country of Publication:
United States
Language:
English