Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Brief reconnaissance study for the addition of hydropower for Cooleemee Dam, Cooleemee, North Carolina

Technical Report ·
OSTI ID:5358737
The feasibility of retrofitting the Cooleemee Dam near Cooleemee, NC for power generation was examined. This dam has a developable head of 18 ft, was built in 1905 for water diversion into a canal and for power generation for a textile mill. The study of environmental, institutional, safety and economic factors showed that hydroelectric power development at this site is economically feasible if a low interest rate for retrofitting cost is available or if the excess power generated can be sold to Duke Power Co. at a suitable rate. (LCL)
Research Organization:
Gebhard (Thomas G.), Austin, TX (USA)
DOE Contract Number:
AC44-80R420006
OSTI ID:
5358737
Report Number(s):
DOE/R4/20006-T2; ON: DE82017272
Country of Publication:
United States
Language:
English