Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Brief reconnaissance study for the addition of hydropower for Ledbetter Pond Dam, Ledbetter, North Carolina

Technical Report ·
OSTI ID:5358703
The feasibility of retrofitting the Ledbetter Pond Dam near Ledbetter, NC for power generation was examined. This dam has a developable head of 27 ft., and was built in 1880 to provide hydropower to a mill which is now defunct. The study of environmental, institutional, safety and economic factors showed that hydroelectric power development at this site is feasible providing the safety of the dam can be assured. (LCL)
Research Organization:
Gebhard (Thomas G.), Austin, TX (USA)
DOE Contract Number:
AC44-80R420006
OSTI ID:
5358703
Report Number(s):
DOE/R4/20006-T26; ON: DE82017167
Country of Publication:
United States
Language:
English