Brief reconnaissance study for the addition of hydropower for Terry Dam, Cynthiana, Kentucky
Technical Report
·
OSTI ID:5358718
The feasibility of retrofitting the Terry Dam near Cynthiana, Kentucky for power generation was examined. This dam has a developable head of 6 ft. and was built in 1920 for municipal water supply for the city. The study of environmental, institutional, safety, and economic factors showed that this site has adequate flow conditions for the development of hydroelectric power. But, the plant factor is low, and the plant would operate less than 50% of the time. The head at the dam is extremely low, and the generation characteristics would be substantially improved if the height of the dam was increased. If any work is performed on the dam in the future, the possibility of increasing the height of the dam and adding hydroelectric power should be investigated. (LCL)
- Research Organization:
- Gebhard (Thomas G.), Austin, TX (USA)
- DOE Contract Number:
- AC44-80R420006
- OSTI ID:
- 5358718
- Report Number(s):
- DOE/R4/20006-T13; ON: DE82017750
- Country of Publication:
- United States
- Language:
- English
Similar Records
Brief reconnaissance study for the addition of hydropower for Wallace Dam, Georgetown, Kentucky
Brief reconnaissance study for the addition of hydropower for Paris Lower City Dam, Paris, Kentucky
Brief reconnaissance study for the addition of hydropower for Municipal Dam and intake structure, Franklin, Kentucky
Technical Report
·
Mon May 24 00:00:00 EDT 1982
·
OSTI ID:5290212
Brief reconnaissance study for the addition of hydropower for Paris Lower City Dam, Paris, Kentucky
Technical Report
·
Mon May 24 00:00:00 EDT 1982
·
OSTI ID:5358715
Brief reconnaissance study for the addition of hydropower for Municipal Dam and intake structure, Franklin, Kentucky
Technical Report
·
Mon May 24 00:00:00 EDT 1982
·
OSTI ID:5252529
Related Subjects
13 HYDRO ENERGY
130100 -- Hydro Energy-- Resources & Availability
130500* -- Hydro Energy-- Economic
Industrial
& Business Aspects
DAMS
ECONOMICS
ENVIRONMENTAL IMPACTS
FEASIBILITY STUDIES
FEDERAL REGION IV
HYDROELECTRIC POWER PLANTS
INSTITUTIONAL FACTORS
KENTUCKY
LOW-HEAD HYDROELECTRIC POWER PLANTS
NORTH AMERICA
POWER PLANTS
POWER POTENTIAL
RETROFITTING
SAFETY
USA
130100 -- Hydro Energy-- Resources & Availability
130500* -- Hydro Energy-- Economic
Industrial
& Business Aspects
DAMS
ECONOMICS
ENVIRONMENTAL IMPACTS
FEASIBILITY STUDIES
FEDERAL REGION IV
HYDROELECTRIC POWER PLANTS
INSTITUTIONAL FACTORS
KENTUCKY
LOW-HEAD HYDROELECTRIC POWER PLANTS
NORTH AMERICA
POWER PLANTS
POWER POTENTIAL
RETROFITTING
SAFETY
USA