Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Brief reconnaissance study for the addition of hydropower for Terry Dam, Cynthiana, Kentucky

Technical Report ·
OSTI ID:5358718
The feasibility of retrofitting the Terry Dam near Cynthiana, Kentucky for power generation was examined. This dam has a developable head of 6 ft. and was built in 1920 for municipal water supply for the city. The study of environmental, institutional, safety, and economic factors showed that this site has adequate flow conditions for the development of hydroelectric power. But, the plant factor is low, and the plant would operate less than 50% of the time. The head at the dam is extremely low, and the generation characteristics would be substantially improved if the height of the dam was increased. If any work is performed on the dam in the future, the possibility of increasing the height of the dam and adding hydroelectric power should be investigated. (LCL)
Research Organization:
Gebhard (Thomas G.), Austin, TX (USA)
DOE Contract Number:
AC44-80R420006
OSTI ID:
5358718
Report Number(s):
DOE/R4/20006-T13; ON: DE82017750
Country of Publication:
United States
Language:
English