Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Brief reconnaissance study for the addition of hydropower for Municipal Dam and intake structure, Franklin, Kentucky

Technical Report ·
OSTI ID:5252529
The feasibility of retrofitting the Municipal Dam near Franklin, Kentucky for power generation was examined. This dam has a developable head of 12 ft., was built in 1962 to provide a municipal water supply. The study of environmental, institutional, safety and economic factors showed that hydroelectric power development at this site appears to be economically feasible at municipal interest rates. (LCL)
Research Organization:
Gebhard (Thomas G.), Austin, TX (USA)
DOE Contract Number:
AC44-80R420006
OSTI ID:
5252529
Report Number(s):
DOE/R4/20006-T5; ON: DE82017745
Country of Publication:
United States
Language:
English