Shawmut hydroelectric redevelopment project. Final technical and construction cost report
This report describes the major steps undertaken by the Central Maine Power Company to redevelop an old existing lowhead (19 to 23 ft) hydroelectric station and, at the same time, demonstrate the commercial viability of such a venture. The report addresses the process of site selection, preliminary conceptual design for determining economic viability, licensing and the regulatory process, final design, and project construction with the objective of presenting to the reader a technical and economical guide useful for a similar undertaking.
- Research Organization:
- Central Maine Power Co., Augusta (USA)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- FC07-80ID12126
- OSTI ID:
- 5121969
- Report Number(s):
- DOE/ID-12126; ON: DE82021007
- Country of Publication:
- United States
- Language:
- English
Similar Records
(Small-Scale Hydroelectric Power Demonstration Project): Jackson Bluff Hydroelectric Project: Final technical and construction cost report. [Near Tallahassee, Florida]
Garland canal power project. Final technical and construction cost report
Upper Mechanicville hydroelectric redevelopment demonstration project. Final technical and construction cost report
Technical Report
·
Mon Sep 01 00:00:00 EDT 1986
·
OSTI ID:7228968
Garland canal power project. Final technical and construction cost report
Technical Report
·
Wed Feb 29 23:00:00 EST 1984
·
OSTI ID:6925477
Upper Mechanicville hydroelectric redevelopment demonstration project. Final technical and construction cost report
Technical Report
·
Sat Mar 31 23:00:00 EST 1984
·
OSTI ID:6564906