Garland canal power project. Final technical and construction cost report
Technical Report
·
OSTI ID:6925477
This report describes the major steps undertaken by the Shoshone (Wyoming) Irrigation District to develop a new lowhead hydroelectric generation plant and to demonstrate the economic feasibility of such a plant. This report addresses the process of site selection and conceptual design, licensing and the regulatory process, final design and equipment selection, and project construction. Technical and economic data are presented in this report.
- Research Organization:
- Shoshone Irrigation District, Powell, WY (USA)
- DOE Contract Number:
- FC07-80ID12129
- OSTI ID:
- 6925477
- Report Number(s):
- DOE/ID/12129-T1; ON: DE84012492
- Country of Publication:
- United States
- Language:
- English
Similar Records
Garland Canal Shoshone Irrigation District hydroelectric project: final operations and maintenance report. Small-Scale Hydroelectric Power Demonstration Project
Shawmut hydroelectric redevelopment project. Final technical and construction cost report
(Small-Scale Hydroelectric Power Demonstration Project): Jackson Bluff Hydroelectric Project: Final technical and construction cost report. [Near Tallahassee, Florida]
Technical Report
·
Tue Oct 01 00:00:00 EDT 1985
·
OSTI ID:6451397
Shawmut hydroelectric redevelopment project. Final technical and construction cost report
Technical Report
·
Sun Aug 01 00:00:00 EDT 1982
·
OSTI ID:5121969
(Small-Scale Hydroelectric Power Demonstration Project): Jackson Bluff Hydroelectric Project: Final technical and construction cost report. [Near Tallahassee, Florida]
Technical Report
·
Mon Sep 01 00:00:00 EDT 1986
·
OSTI ID:7228968