Jefferson Lab IR FEL cryomodule modifications and test results
Conference
·
OSTI ID:489631
- Thomas Jefferson National Accelerator Facility, Newport News, VA (United States); and others
The Infrared Free Electron Laser being constructed at the Thomas Jefferson National Accelerator Facility will require a 42 MeV, 5 mA electron accelerator. The accelerator design requires a 10 MeV injector and a two pass 32 MeV linac, one pass for acceleration and one pass for energy recovery. In order to minimize the cost of the linac, standard CEBAF 1497 MHZ Superconducting Radio Frequency cavities and cryomodules are being used with minimal changes. Two SRF cavities, housed in a quarter cryomodule, operate at a nominal 10 MV/m to provide the injector energy. The linac is composed of one cryomodule, housing eight SRF cavities operating at an average gradient of 8 MV/m. The modifications to the cryomodule are being made to handle the higher beam current, to improve RF control, and to increase machine reliability. The modifications to the higher order mode (HOM) loads, cavity tuners, cavity beam line, warm and cold RF windows, and cryogenic shield are described. Test results from the injector quarter cryomodule are also presented.
- Research Organization:
- Southeastern Universities Research Association, Inc., Newport News, VA (United States)
- Sponsoring Organization:
- USDOE Office of Energy Research, Washington, DC (United States)
- DOE Contract Number:
- AC05-84ER40150
- OSTI ID:
- 489631
- Report Number(s):
- DOE/ER/40150--1138; JLAB-ACT--97-03; CONF-970503--27; ON: DE97006518
- Country of Publication:
- United States
- Language:
- English
Similar Records
Performance of the FEL cryomodules
Performance of the First Refurbished CEBAF Cryomodule
Overview and Lessons Learned of the Jefferson Lab Cryomodule Production for the CEBAF 12 GeV Upgrade
Journal Article
·
Tue Sep 01 00:00:00 EDT 1998
·
OSTI ID:754513
Performance of the First Refurbished CEBAF Cryomodule
Conference
·
Mon Jul 02 00:00:00 EDT 2007
·
OSTI ID:909320
Overview and Lessons Learned of the Jefferson Lab Cryomodule Production for the CEBAF 12 GeV Upgrade
Conference
·
Sat Nov 30 23:00:00 EST 2013
·
OSTI ID:1113734