Performance of the First Refurbished CEBAF Cryomodule
Conference
·
OSTI ID:909320
The Thomas Jefferson National Accelerator Facility has begun a cryomodule refurbishment project. The goal of this project is robust 6 GeV, 5 pass operation of the Continuous Electron Beam Accelerator Facility (CEBAF). The scope of the project includes removing, refurbishing and replacing 10 CEBAF cryomodules at a rate of three per year. Refurbishment includes reprocessing of SRF cavities to eliminate field emission and increase the nominal gradient from the original 5 MV/m to 12.5 MV/m. New “dogleg” couplers between the cavity and helium vessel flanges will intercept secondary electrons that produce arcing on the 2 K ceramic window in the Fundamental Power Coupler (FPC). Modification of the Qext of the FPC will allow higher gradient operations. Other changes include new ceramic RF windows for the air to vacuum interface of the FPC and improvements to the mechanical tuners. Any damaged or worn components will be replaced as well. Currently, the first of the refurbished cryomodules has been installed and tested both in the Cryomodule Test Facility and in place in the North Linac of CEBAF. This paper will summarize the results of these tests.
- Research Organization:
- Thomas Jefferson National Accelerator Facility, Newport News, VA
- Sponsoring Organization:
- USDOE - Office of Energy Research (ER)
- DOE Contract Number:
- AC05-06OR23177
- OSTI ID:
- 909320
- Report Number(s):
- JLAB-ACC-07-672; DOE/OR/23177-0073
- Country of Publication:
- United States
- Language:
- English
Similar Records
Overview of the First Five Refurbished CEBAF Cryomodules
Overview of the First Five Refurbished CEBAF Cryomodules
Summary Report for the C50 Cryomodule Project
Conference
·
Thu Oct 01 00:00:00 EDT 2009
·
OSTI ID:2006588
Overview of the First Five Refurbished CEBAF Cryomodules
Conference
·
Wed Oct 01 00:00:00 EDT 2008
·
OSTI ID:956064
Summary Report for the C50 Cryomodule Project
Conference
·
Mon Feb 28 23:00:00 EST 2011
·
OSTI ID:1032455