OPERATION AND PERFORMANCE OF TEMPERATURE-CONTROL CIRCUIT PROJECT 102, CONTROL SYSTEM
Technical Report
·
OSTI ID:4795442
>A report on the theory of operation, design, calibration and test, and the performance of a temperature-control circuit for project 102 is presented. The various components are discussed and typical circuit data are presented along with schematic drawings, sketches, and photographs. Tests of transient response and steady-state accuracy of the temperature-control circuit, operated in connection with both the control system mockup and the final manufactured system, gave satisfactory results. (auth)
- Research Organization:
- General Electric Co. Aircraft Nuclear Propulsion Dept., Cincinnati
- DOE Contract Number:
- AT(11-1)-171
- NSA Number:
- NSA-16-014226
- OSTI ID:
- 4795442
- Report Number(s):
- DC-58-8-231
- Country of Publication:
- United States
- Language:
- English
Similar Records
OPERATION AND PERFORMANCE OF POWER RANGE SYSTEM AND CHANNEL SELECTOR CIRCUITRY PROJECT 102 CONTROL SYSTEM
COMPILATION OF UNCLASSIFIED PROJECT 102 CONTROLS AND INSTRUMENTATION SCHEMATIC DIAGRAMS, DRAWINGS AND PHOTOGRAPHS
P-102 ION CHAMBER IRRADIATION IN THE MTR
Technical Report
·
Tue Jul 23 00:00:00 EDT 1957
·
OSTI ID:4795361
COMPILATION OF UNCLASSIFIED PROJECT 102 CONTROLS AND INSTRUMENTATION SCHEMATIC DIAGRAMS, DRAWINGS AND PHOTOGRAPHS
Technical Report
·
Fri Aug 14 00:00:00 EDT 1959
·
OSTI ID:4801619
P-102 ION CHAMBER IRRADIATION IN THE MTR
Technical Report
·
Sun Feb 22 23:00:00 EST 1959
·
OSTI ID:4840354