OPERATION AND PERFORMANCE OF POWER RANGE SYSTEM AND CHANNEL SELECTOR CIRCUITRY PROJECT 102 CONTROL SYSTEM
Technical Report
·
OSTI ID:4795361
The theory of operation, the calibration and test, the performance, the operating procedure, and typical circuit voltage readings for the power range system and the channel selector circuit of Project 102 are given. Schematic drawings, sketches, and photographs are included. (suth)
- Research Organization:
- General Electric Co. Aircraft Nuclear Propulsion Dept., Cincinnati
- DOE Contract Number:
- AT(11-1)-171
- NSA Number:
- NSA-16-014284
- OSTI ID:
- 4795361
- Report Number(s):
- DC-57-7-177
- Country of Publication:
- United States
- Language:
- English
Similar Records
OPERATION AND PERFORMANCE OF TEMPERATURE-CONTROL CIRCUIT PROJECT 102, CONTROL SYSTEM
MAINTENANCE HANDBOOK D102A CONTROL SYSTEM (33-7100)
COMPILATION OF UNCLASSIFIED PROJECT 102 CONTROLS AND INSTRUMENTATION SCHEMATIC DIAGRAMS, DRAWINGS AND PHOTOGRAPHS
Technical Report
·
Wed Aug 27 00:00:00 EDT 1958
·
OSTI ID:4795442
MAINTENANCE HANDBOOK D102A CONTROL SYSTEM (33-7100)
Technical Report
·
Mon Jun 15 00:00:00 EDT 1959
·
OSTI ID:4831727
COMPILATION OF UNCLASSIFIED PROJECT 102 CONTROLS AND INSTRUMENTATION SCHEMATIC DIAGRAMS, DRAWINGS AND PHOTOGRAPHS
Technical Report
·
Fri Aug 14 00:00:00 EDT 1959
·
OSTI ID:4801619