FABRICATION OF EBR-II, CORE-I FUEL PINS
A total of 11,117 enriched uranium-5 wt.% fissium alloy fuel pins was manufactured for EBR-II, Core I. These were made from a synthetic fission product alloy of nonradioactive elements, natural uranium, and enriched uranium. The material was supplied as precast billets. The manufacturing methods were developed for the EBR-III Fuel Cycle Facility. Experimental refabrication equipment was used to production test both the methods and the equipment. The billets were induction melted and pressure cast into precision-bore, high-silica glass molds in batches of 90 to 160. The number of molds used was adjusted according to batch weight. After casting, the molds were broken away and the castings were fed into a pin-process and inspection machine. Both ends were sheared from the castings to produce finished pins measuring 0.144 in. in diameter by 14.22 in. long. The pins were inspected for diameter, porosity, weight, and length. Rejected pins and sheared ends were broken into short lengths and returned for consolidation. Acceptable fuel pins were sealed and sodium bonded in stainless steel jackets, and assembled into Core-I fuel elements. (auth)
- Research Organization:
- Argonne National Lab., Ill.
- DOE Contract Number:
- W-31109-ENG-38
- NSA Number:
- NSA-16-030740
- OSTI ID:
- 4768092
- Report Number(s):
- ANL-6274
- Country of Publication:
- United States
- Language:
- English
Similar Records
EQUIPMENT FOR REMOTE INJECTION CASTING OF EBR-II FUEL
PREPARATION OF ALLOY FOR FIRST CORE LOADING OF EBR-II
DEVELOPMENT OF METHODS FOR THE REFABRICATION OF EBR-II FUEL ELEMENTS. PART I. ENGINEERING CONSIDERATIONS FOR EBR-II FUEL REFABRICATION. PART II. DEVELOPMENT OF INJECTION CASTING METHODS AND EQUIPMENT. PART III. DEVELOPMENT OF FUEL PIN PROCESSING METHODS AND EQUIPMENT. PART IV. ASSEMBLY, WELDING, AND LEAK TESTING EBR-II FUEL RODS. PART V. DODIUM BONDING AND BOND TESTING EBR-II FU
Journal Article
·
Wed Feb 28 23:00:00 EST 1962
· Nuclear Sci. and Eng.
·
OSTI ID:4803797
PREPARATION OF ALLOY FOR FIRST CORE LOADING OF EBR-II
Technical Report
·
Tue Aug 01 00:00:00 EDT 1961
·
OSTI ID:4832824
DEVELOPMENT OF METHODS FOR THE REFABRICATION OF EBR-II FUEL ELEMENTS. PART I. ENGINEERING CONSIDERATIONS FOR EBR-II FUEL REFABRICATION. PART II. DEVELOPMENT OF INJECTION CASTING METHODS AND EQUIPMENT. PART III. DEVELOPMENT OF FUEL PIN PROCESSING METHODS AND EQUIPMENT. PART IV. ASSEMBLY, WELDING, AND LEAK TESTING EBR-II FUEL RODS. PART V. DODIUM BONDING AND BOND TESTING EBR-II FU
Technical Report
·
Tue Jan 31 23:00:00 EST 1961
·
OSTI ID:4779821