Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

PREPARATION OF ALLOY FOR FIRST CORE LOADING OF EBR-II

Technical Report ·
DOI:https://doi.org/10.2172/4832824· OSTI ID:4832824
The alloy used for the fabrication of the fuel pins for the first core loading of the second Experimental Breeder Reactor (EBR-II) was prepared in the prototype equipment developed for the melt-refining processing of the irradiated EBR-II fuel. One hundred and twenty-five 10-kg ingots were made, of which 40 were unenriched uranium-fissium alloy and 85 were enriched uranium-fissium alloy. In addition, nineteen 10-kg batches of unenriched uranium-fissium scrap and forty- seven 10-kg batches of enriched uraniumfissium alloy scrap were melted for consolidation into ingots. The average yield for the alloy preparation runs was 96.5% and for the scrap remelt runs was 93%. The chemical and isotopic compositions of the ingots produced were all within specifications (95 plus or minus 1.0 wt% uranium, of which 48.1 plus or minus 1.2 wt% is U/sup 235/). (auth)
Research Organization:
Argonne National Lab., Ill.
DOE Contract Number:
W-31109-ENG-38
NSA Number:
NSA-15-031852
OSTI ID:
4832824
Report Number(s):
ANL-6290
Country of Publication:
United States
Language:
English

Similar Records

FABRICATION OF EBR-II, CORE-I FUEL PINS
Technical Report · Fri Jun 01 00:00:00 EDT 1962 · OSTI ID:4768092

THE MELT REFINING OF IRRADIATED URANIUM: APPLICATION TO EBR-II FAST REACTOR FUEL. III. PREPARATION OF EXPERIMENTAL ALLOYS
Journal Article · Mon Nov 30 23:00:00 EST 1959 · Nuclear Sci. and Eng. · OSTI ID:4195061

Irradiation Behavior of Unencapsulated EBR-II Mark-II Driver Fuel to a Maximum Burnupof 6 at. %
Technical Report · Sat Jan 31 19:00:00 EST 1976 · OSTI ID:7348304