PREPARATION OF ALLOY FOR FIRST CORE LOADING OF EBR-II
The alloy used for the fabrication of the fuel pins for the first core loading of the second Experimental Breeder Reactor (EBR-II) was prepared in the prototype equipment developed for the melt-refining processing of the irradiated EBR-II fuel. One hundred and twenty-five 10-kg ingots were made, of which 40 were unenriched uranium-fissium alloy and 85 were enriched uranium-fissium alloy. In addition, nineteen 10-kg batches of unenriched uranium-fissium scrap and forty- seven 10-kg batches of enriched uraniumfissium alloy scrap were melted for consolidation into ingots. The average yield for the alloy preparation runs was 96.5% and for the scrap remelt runs was 93%. The chemical and isotopic compositions of the ingots produced were all within specifications (95 plus or minus 1.0 wt% uranium, of which 48.1 plus or minus 1.2 wt% is U/sup 235/). (auth)
- Research Organization:
- Argonne National Lab., Ill.
- DOE Contract Number:
- W-31109-ENG-38
- NSA Number:
- NSA-15-031852
- OSTI ID:
- 4832824
- Report Number(s):
- ANL-6290
- Country of Publication:
- United States
- Language:
- English
Similar Records
FABRICATION OF EBR-II, CORE-I FUEL PINS
THE MELT REFINING OF IRRADIATED URANIUM: APPLICATION TO EBR-II FAST REACTOR FUEL. III. PREPARATION OF EXPERIMENTAL ALLOYS
Irradiation Behavior of Unencapsulated EBR-II Mark-II Driver Fuel to a Maximum Burnupof 6 at. %
Technical Report
·
Fri Jun 01 00:00:00 EDT 1962
·
OSTI ID:4768092
THE MELT REFINING OF IRRADIATED URANIUM: APPLICATION TO EBR-II FAST REACTOR FUEL. III. PREPARATION OF EXPERIMENTAL ALLOYS
Journal Article
·
Mon Nov 30 23:00:00 EST 1959
· Nuclear Sci. and Eng.
·
OSTI ID:4195061
Irradiation Behavior of Unencapsulated EBR-II Mark-II Driver Fuel to a Maximum Burnupof 6 at. %
Technical Report
·
Sat Jan 31 19:00:00 EST 1976
·
OSTI ID:7348304