DEVELOPMENT OF METHODS FOR THE REFABRICATION OF EBR-II FUEL ELEMENTS. PART I. ENGINEERING CONSIDERATIONS FOR EBR-II FUEL REFABRICATION. PART II. DEVELOPMENT OF INJECTION CASTING METHODS AND EQUIPMENT. PART III. DEVELOPMENT OF FUEL PIN PROCESSING METHODS AND EQUIPMENT. PART IV. ASSEMBLY, WELDING, AND LEAK TESTING EBR-II FUEL RODS. PART V. DODIUM BONDING AND BOND TESTING EBR-II FU
The development of remote fabrication methods and equipment in which the cooling periods, chemical fission product separation, and complete decontamination of the fuel is not required is discussed. A process designed around precision casting in multiple, glass molds served as a basis for design of refabrication equipment. The injection casting process is used. Procedures and equipment were developed for the remote manufacture of right-cylindrical, uranium alloy fuel pins from the castings. Assembly, welding, and leak testing of the EBR-II fuel rods are described. Methods of sodium bonding and bond testing are described. (M.C.G.)
- Research Organization:
- Argonne National Lab., Ill.
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- W-31-109-ENG-28
- NSA Number:
- NSA-16-031222
- OSTI ID:
- 4779821
- Report Number(s):
- TID-12402; UAC-5003
- Resource Relation:
- Other Information: Orig. Receipt Date: 31-DEC-62
- Country of Publication:
- United States
- Language:
- English
Similar Records
Engineering Considerations for Remote Refabrication of EBR-II Fuel Elements
EQUIPMENT FOR REMOTE INJECTION CASTING OF EBR-II FUEL
FABRICATION OF EBR-II, CORE-I FUEL PINS
Journal Article
·
Thu Mar 01 00:00:00 EST 1962
· Nuclear Sci. and Eng.
·
OSTI ID:4779821
EQUIPMENT FOR REMOTE INJECTION CASTING OF EBR-II FUEL
Journal Article
·
Thu Mar 01 00:00:00 EST 1962
· Nuclear Sci. and Eng.
·
OSTI ID:4779821
FABRICATION OF EBR-II, CORE-I FUEL PINS
Technical Report
·
Fri Jun 01 00:00:00 EDT 1962
·
OSTI ID:4779821