Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

RESPONSE OF DUAL-PURPOSE REINFORCED-CONCRETE MASS SHELTER

Technical Report ·
DOI:https://doi.org/10.2172/4186718· OSTI ID:4186718

A typical full-scale section of a prototype reinforced concrete dual- purpose underground parking garage and personnel shelter was tested at the predicted 35-psi peak overpressure level of a nuclear blast. The primary purpose was to evaluate the capabilities of the structure in providing protection against effects of a nuclear detonation. Secondary objectives were to obtain additional information regarding blast load transmitted to underground structures. information regarding reflected and dynamic pressures in the ramp and on the entranceway door, data on nuclear radiation attenuation characteristics of the structure, and design features. Results are described and illustrated photographically. (C.H.)

Research Organization:
Ammann and Whitney, New York
NSA Number:
NSA-14-014956
OSTI ID:
4186718
Report Number(s):
ITR-1449
Country of Publication:
Country unknown/Code not available
Language:
English

Similar Records

RESPONSE OF DUAL-PURPOSE REINFORCED-CONCRETE MASS SHELTER
Technical Report · Fri Mar 31 23:00:00 EST 1961 · OSTI ID:4777973

Response of dual-purpose reinforced-concrete mass shelter. Project 30. 2 of Operation Plumbbob
Technical Report · Fri Mar 31 23:00:00 EST 1961 · OSTI ID:6690429

TEST OF FRENCH UNDERGROUND PERSONNEL SHELTERS
Technical Report · Wed Jun 01 00:00:00 EDT 1960 · OSTI ID:4818805