PRELIMINARY DESIGN STUDY OF SM-2 (APPR-1B) PWR-STEAM ELECTRIC STATION. VOLUME II. PRELIMINARY DESIGN STUDY OF REACTOR SYSTEM AND AUXILIARIES
Technical Report
·
OSTI ID:4182214
A portion of the work presented in this report was performed by Bechtel Corp., San Francisco. Results are presented on the preliminary design study of the SM-2 reactor system and auxiliaries. The equipment, building, services, and estimated cost are defined. All efforts were made to produce a primary system design which meets the transient response requirements and the high reliability requirements. (W.D.M.)
- Research Organization:
- Alco Products, Inc., Schenectady, N.Y.
- DOE Contract Number:
- DA-44-009-ENG-3506
- NSA Number:
- NSA-14-016434
- OSTI ID:
- 4182214
- Report Number(s):
- APAE-40(Vol.II)
- Resource Relation:
- Other Information: A portion of the work presented in this report was performed by Bechtel Corp., San Francisco. Orig. Receipt Date: 31-DEC-60
- Country of Publication:
- United States
- Language:
- English
Similar Records
PRELIMINARY DESIGN STUDY OF APPR-1B PWR-STEAM ELECTRIC STATION. VOLUME I. PRELIMINARY DESIGN STUDY OF STEAM-ELECTRIC CONVERSION SYSTEM
SM-2--TRANSIENT VOLTAGE AND FREQUENCY ANALYSIS BY PLANT ANALOG SIMULATION. Final Report
DESIGN ANALYSIS OF A PREPACKAGED NUCLEAR POWER PLANT (1000 eKW). VOLUME I. PRIMARY AND SECONDARY SYSTEM DESIGN
Technical Report
·
Thu Dec 11 00:00:00 EST 1958
·
OSTI ID:4182214
SM-2--TRANSIENT VOLTAGE AND FREQUENCY ANALYSIS BY PLANT ANALOG SIMULATION. Final Report
Technical Report
·
Mon Nov 16 00:00:00 EST 1959
·
OSTI ID:4182214
DESIGN ANALYSIS OF A PREPACKAGED NUCLEAR POWER PLANT (1000 eKW). VOLUME I. PRIMARY AND SECONDARY SYSTEM DESIGN
Technical Report
·
Sun Feb 01 00:00:00 EST 1959
·
OSTI ID:4182214