PRELIMINARY DESIGN STUDY OF APPR-1B PWR-STEAM ELECTRIC STATION. VOLUME I. PRELIMINARY DESIGN STUDY OF STEAM-ELECTRIC CONVERSION SYSTEM
Technical Report
·
OSTI ID:4153567
A portion of the work presented in this report was performed by Bechtel Corp., San Francisco. The preliminary design of the SM-2 secondary system (power conversion equipment) is reported. Parameters, equipment, building, services, estimated cost, reliability, and a point of departure in meeting the required "quality of power" are discussed. (W.D.M.)
- Research Organization:
- Alco Products, Inc., Schenectady, N.Y.
- DOE Contract Number:
- DA-44-009-ENG-3506
- NSA Number:
- NSA-14-016433
- OSTI ID:
- 4153567
- Report Number(s):
- APAE-40(Vol.I)
- Resource Relation:
- Other Information: A portion of the work presented in this report was performed by Bechtel Corp., San Francisco. Orig. Receipt Date: 31-DEC-60
- Country of Publication:
- United States
- Language:
- English
Similar Records
PRELIMINARY DESIGN STUDY OF SM-2 (APPR-1B) PWR-STEAM ELECTRIC STATION. VOLUME II. PRELIMINARY DESIGN STUDY OF REACTOR SYSTEM AND AUXILIARIES
IRRADIATION AND POST-IRRADIATION EXAMINATION OF APPR TYPE FUEL ELEMENTS
DESIGN ANALYSIS OF A PREPACKAGED NUCLEAR POWER PLANT (1000 eKW). VOLUME I. PRIMARY AND SECONDARY SYSTEM DESIGN
Technical Report
·
Mon Jun 01 00:00:00 EDT 1959
·
OSTI ID:4153567
IRRADIATION AND POST-IRRADIATION EXAMINATION OF APPR TYPE FUEL ELEMENTS
Technical Report
·
Sun Nov 01 00:00:00 EST 1959
·
OSTI ID:4153567
DESIGN ANALYSIS OF A PREPACKAGED NUCLEAR POWER PLANT (1000 eKW). VOLUME I. PRIMARY AND SECONDARY SYSTEM DESIGN
Technical Report
·
Sun Feb 01 00:00:00 EST 1959
·
OSTI ID:4153567