Operation upshot-knothole, Nevada proving grounds, March-June 1953. Report to the test director. Alpha and transit time measurement. Projects 10.1 and 10.2 (sanitized version)
Technical Report
·
OSTI ID:415950
Alpha was measured by Edgerton, Germeshausen and Grier, Inc. (EG&G), on all shots. The data were recorded by means of systems employing oscilloscope indicators deflected by the application of a signal voltage proprotional to the neutron flux on one axis and either a sine wave (Rossi sweep) or a linear time base sweep on the perpendicular axis. Transit time was measured on all tower shots, using standard spiral sweep traces for the first three shots and raster sweeps thereafter. EG&G installed, calibrated, tested, and operated alpha and transit time equipment during Operation Upshot-Knothole.
- Research Organization:
- Edgerton, Germeshausen and Grier, Inc., Boston, MA (United States)
- OSTI ID:
- 415950
- Report Number(s):
- PB--97-112767/XAB
- Country of Publication:
- United States
- Language:
- English
Similar Records
Operation upshot-knothole, Nevada proving grounds. March-June 1953. Report to the test director. Timing and firing (sanitized version)
Operation plumbbob, report to the test director. Nevada Test Site, May-October 1957. Timing and firing. Sanitized version
Operation UPSHOT-KNOTHOLE, 1953. Technical report
Technical Report
·
Sun Jan 31 23:00:00 EST 1954
·
OSTI ID:415949
Operation plumbbob, report to the test director. Nevada Test Site, May-October 1957. Timing and firing. Sanitized version
Technical Report
·
Sun Jun 01 00:00:00 EDT 1958
·
OSTI ID:432722
Operation UPSHOT-KNOTHOLE, 1953. Technical report
Technical Report
·
Sun Jan 10 23:00:00 EST 1982
·
OSTI ID:6439285