Operation upshot-knothole, Nevada proving grounds. March-June 1953. Report to the test director. Timing and firing (sanitized version)
Technical Report
·
OSTI ID:415949
Edgerton, Germeshausen and Grier, Inc., was commissioned to as part of the timing and firing functions on Upshot-Knothole (March to June 1953): Generate and distribute predetonation timing signals for all shots; three airdrops, seven tower shots, and one cannon shot; Install and operate switching relays connected to the timing circuits at the various experimental locations; Install and operate the bomb-firing and monitoring circuits for the seven tower shots; Install and operate the firing mechanism for the cannon shot; Determine the time of detonation, with respect to World Time, of all shots; Determine the time of fall for the three airdrops and the time of flight of the projectile on the cannon shot; Generate and deliver to the communications group a 1000-cycle tone keyed to a specific code; Telemeter, record and indicate meteorological data; Provide timing dry runs for the benefit of experimenters twice daily and more often if required; and Provide personnel to serve as members of the firing team as directed by the Test Director.
- Research Organization:
- Edgerton, Germeshausen and Grier, Inc., Boston, MA (United States)
- OSTI ID:
- 415949
- Report Number(s):
- PB--97-112759/XAB
- Country of Publication:
- United States
- Language:
- English
Similar Records
Operation upshot-knothole, Nevada proving grounds, March-June 1953. Report to the test director. Alpha and transit time measurement. Projects 10.1 and 10.2 (sanitized version)
Operation Upshot-Knothole
Operation plumbbob, report to the test director. Nevada Test Site, May-October 1957. Timing and firing. Sanitized version
Technical Report
·
Fri Jul 01 00:00:00 EDT 1955
·
OSTI ID:415950
Operation Upshot-Knothole
Technical Report
·
Wed Jan 19 23:00:00 EST 2022
·
OSTI ID:1841888
Operation plumbbob, report to the test director. Nevada Test Site, May-October 1957. Timing and firing. Sanitized version
Technical Report
·
Sun Jun 01 00:00:00 EDT 1958
·
OSTI ID:432722