Final decision document for the interim response action at the Rocky Mountain Arsenal, hydrazine blending and storage facility. Final report
Technical Report
·
OSTI ID:415892
This interim response action will consist of: (1) the treatment and disposal of waste products and (2) disposal of all structures associated with the Hydrazine Blending and Storage Facility. This final decision document provides summaries of: (1) alternatives considered; (2) significant events leading to the initiation of the IRA; (3) the IRA project; and (4) the applicable or relevant and appropriate requirements, standards, criteria, and limitations (ARAR`S) associated with the program. Either ozone/UV or hydrogen peroxide/UV is recommended for treatment of wastewater. Comments and responses are found in the appendix.
- Research Organization:
- Rocky Mountain Arsenal, Denver, CO (United States)
- OSTI ID:
- 415892
- Report Number(s):
- AD-A--313464/0/XAB; RMA--88329R02
- Country of Publication:
- United States
- Language:
- English
Similar Records
Proposed decision document for the interim action at the Rocky Mountain Arsenal, hydrazine blending and storage facility
Final decision document for the interim response action for the closure of abandoned wells at Rocky Mountain Arsenal. Final report
Draft final decision document for the interim response action for the improvement of the north boundary system at Rocky Mountain Arsenal via construction of groundwater recharge trenches. Final report
Technical Report
·
Fri Jul 01 00:00:00 EDT 1988
·
OSTI ID:250582
Final decision document for the interim response action for the closure of abandoned wells at Rocky Mountain Arsenal. Final report
Technical Report
·
Wed Jun 01 00:00:00 EDT 1988
·
OSTI ID:415888
Draft final decision document for the interim response action for the improvement of the north boundary system at Rocky Mountain Arsenal via construction of groundwater recharge trenches. Final report
Technical Report
·
Wed Jun 01 00:00:00 EDT 1988
·
OSTI ID:415889