Draft final decision document for the interim response action for the improvement of the north boundary system at Rocky Mountain Arsenal via construction of groundwater recharge trenches. Final report
Technical Report
·
OSTI ID:415889
The objective of this interim response action is to correct a hydraulic imbalance in the North Boundary treatment and recharge system. Ten gravel filled recharge trenches will be constructed along the downgradient side of the slurry wall. This draft final decision document provides summaries of: (1) alternatives considered; (2) significant events leading to the initiation of the IRA; (3) the IRA project; and (4) the applicable or relevant and appropriate requirements, standards, criteria, or limitations (ARAR`S) associated with the program. Comments and responses are found in the appendix.
- Research Organization:
- Rocky Mountain Arsenal, Denver, CO (United States)
- OSTI ID:
- 415889
- Report Number(s):
- AD-A--313458/2/XAB; RMA--88328R03
- Country of Publication:
- United States
- Language:
- English
Similar Records
Draft final decision document for the north boundary system improvements interim response action at the Rocky Mountain Arsenal
Final decision document for the north boundary system improvements, Interim Response Action at the Rocky Mountain Arsenal
Final decision document for the interim response action for the improvement of the north boundary system at Rocky Mountain Arsenal via construction of groundwater recharge trenches
Technical Report
·
Fri Mar 31 23:00:00 EST 1989
·
OSTI ID:5272460
Final decision document for the north boundary system improvements, Interim Response Action at the Rocky Mountain Arsenal
Technical Report
·
Fri Mar 31 23:00:00 EST 1989
·
OSTI ID:6874324
Final decision document for the interim response action for the improvement of the north boundary system at Rocky Mountain Arsenal via construction of groundwater recharge trenches
Technical Report
·
Fri Jul 01 00:00:00 EDT 1988
·
OSTI ID:5483821