REACTOR PLANT CONTAINER INTEGRITY TEST, CORE I, SEED 2. Test Results DLCS- 3570201(T-643733)
Technical Report
·
OSTI ID:4150751
Tests were conducted to prove the integrity of the 48inch butterfly valves in the PWR reactor plant by means of air pressure, visual inspection, and operating check. The leak rate on 1A and 1B exhaust valves was 4.1 psi/hr, while the rate on the 1C and 1D supply valves was 5.6 psi/hr. These leak rates were deemed acceptable by the Atomic Energy Commission. (J.R.D.)
- Research Organization:
- Duquesne Light Co., Shippingport, Penna.
- NSA Number:
- NSA-14-017603
- OSTI ID:
- 4150751
- Report Number(s):
- TID-5942
- Country of Publication:
- Country unknown/Code not available
- Language:
- English
Similar Records
REACTOR PLANT CONTAINER INTEGRITY TEST. Test Evaluation. Core 1, Seed 3
PERIODIC REACTOR PLANT CONTAINER AIR LOCKS AND 48-INCH BUTTERFLY VALVES LEAKAGE AND PERFORMANCE TEST. SECTION II. FIRST PERFORMANCE. Test Results DL-S-206 (T-641103A)
REACTOR PLANT CONTAINER INTEGRITY TEST (BUTTERFLY VALVE TEST). Test Evaluation
Technical Report
·
Wed Oct 30 23:00:00 EST 1963
·
OSTI ID:4691882
PERIODIC REACTOR PLANT CONTAINER AIR LOCKS AND 48-INCH BUTTERFLY VALVES LEAKAGE AND PERFORMANCE TEST. SECTION II. FIRST PERFORMANCE. Test Results DL-S-206 (T-641103A)
Technical Report
·
Wed May 20 00:00:00 EDT 1959
·
OSTI ID:4256881
REACTOR PLANT CONTAINER INTEGRITY TEST (BUTTERFLY VALVE TEST). Test Evaluation
Technical Report
·
Mon Sep 23 00:00:00 EDT 1963
·
OSTI ID:4137858