Acceptance test report for the Westinghouse 100 ton hydraulic trailer
The SY-101 Equipment Removal System 100 Ton Hydraulic Trailer was designed and built by KAMP Systems, Inc. Performance of the Acceptance Test Procedure at KAMP`s facility in Ontario, California (termed Phase 1 in this report) was interrupted by discrepancies noted with the main hydraulic cylinder. The main cylinder was removed and sent to REMCO for repair while the trailer was sent to Lampson`s facility in Pasco, Washington. The Acceptance Test Procedure was modified and performance resumed at Lampson (termed Phase 2 in this report) after receipt of the repaired cylinder. At the successful conclusion of Phase 2 testing the trailer was accepted as meeting all the performance criteria specified.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 41303
- Report Number(s):
- WHC-SD-WM-ATR--112; ON: DE95008807
- Country of Publication:
- United States
- Language:
- English
Similar Records
Factory Acceptance Test Procedure Westinghouse 100 ton Hydraulic Trailer
Acceptance test procedure, 241-SY-101 Flexible Receiver System, Phase III testing
Acceptance test procedure, 241-SY-101/241-C-106 shot loading system
Technical Report
·
Tue Nov 15 23:00:00 EST 1994
·
OSTI ID:10104026
Acceptance test procedure, 241-SY-101 Flexible Receiver System, Phase III testing
Technical Report
·
Sun Nov 20 23:00:00 EST 1994
·
OSTI ID:10107091
Acceptance test procedure, 241-SY-101/241-C-106 shot loading system
Technical Report
·
Mon Oct 31 23:00:00 EST 1994
·
OSTI ID:10191810