Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Factory Acceptance Test Procedure Westinghouse 100 ton Hydraulic Trailer

Technical Report ·
DOI:https://doi.org/10.2172/10104026· OSTI ID:10104026
 [1]
  1. Westinghouse Hanford Co., Richland, WA (United States)
This Factory Acceptance Test Procedure (FAT) is for the Westinghouse 100 Ton Hydraulic Trailer. The trailer will be used for the removal of the 101-SY pump. This procedure includes: safety check and safety procedures; pre-operation check out; startup; leveling trailer; functional/proofload test; proofload testing; and rolling load test.
Research Organization:
Westinghouse Hanford Co., Richland, WA (United States); Kamp Systems, Ontario, CA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
10104026
Report Number(s):
WHC-SD-WM-ATP--112; ON: DE95003781; BR: 35AF11201/35AF11202
Country of Publication:
United States
Language:
English