Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Compressed air piping, 241-SY-101 hydraulic pump retrieval trailer

Technical Report ·
DOI:https://doi.org/10.2172/39098· OSTI ID:39098
The following Design Analysis was prepared by the Westinghouse Hanford Company to determine pressure losses in the compressed air piping installed on the hydraulic trailer for the 241-SY-101 pump retrieval mission.
Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
39098
Report Number(s):
WHC-SD-WM-DA--183; ON: DE95005097
Country of Publication:
United States
Language:
English

Similar Records

Acceptance Test Report for 241-SY Pump Cradle Hydraulic System
Technical Report · Tue Mar 07 23:00:00 EST 1995 · OSTI ID:48722

Factory Acceptance Test Procedure Westinghouse 100 ton Hydraulic Trailer
Technical Report · Tue Nov 15 23:00:00 EST 1994 · OSTI ID:10104026

Design review report for 101-SY spare mixer pump
Technical Report · Wed Oct 19 00:00:00 EDT 1994 · OSTI ID:10194784