Compressed air piping, 241-SY-101 hydraulic pump retrieval trailer
The following Design Analysis was prepared by the Westinghouse Hanford Company to determine pressure losses in the compressed air piping installed on the hydraulic trailer for the 241-SY-101 pump retrieval mission.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 39098
- Report Number(s):
- WHC-SD-WM-DA--183; ON: DE95005097
- Country of Publication:
- United States
- Language:
- English
Similar Records
Acceptance Test Report for 241-SY Pump Cradle Hydraulic System
Factory Acceptance Test Procedure Westinghouse 100 ton Hydraulic Trailer
Design review report for 101-SY spare mixer pump
Technical Report
·
Tue Mar 07 23:00:00 EST 1995
·
OSTI ID:48722
Factory Acceptance Test Procedure Westinghouse 100 ton Hydraulic Trailer
Technical Report
·
Tue Nov 15 23:00:00 EST 1994
·
OSTI ID:10104026
Design review report for 101-SY spare mixer pump
Technical Report
·
Wed Oct 19 00:00:00 EDT 1994
·
OSTI ID:10194784