Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Acceptance test procedure, 241-SY-101 Flexible Receiver System, Phase III testing

Technical Report ·
DOI:https://doi.org/10.2172/10107091· OSTI ID:10107091
This Acceptance Test Procedure is for the 241-SY-101 Flexible Receiver System, Phase III Testing. This procedure will test the sealing integrity of the Flexible Receiver System to ensure that release of waste and aerosols will be minimized during the removal of the test mixer pump from tank SY-101.
Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
10107091
Report Number(s):
WHC-SD-WM-ATP--093; ON: DE95004510
Country of Publication:
United States
Language:
English