GENERAL DESCRIPTION OF THE 80'' BUBBLE CHAMBER REFRIGERATION SYSTEM
Technical Report
·
OSTI ID:4119754
The reliability and capacity of the refrigeration systems are discussed. The hydrogen and nitrogen systems are described and design specifications are given. The expansion system purifier, control systems, and gas analysis are considered. (D.L.C.)
- Research Organization:
- Brookhaven National Lab., Upton, N.Y.
- DOE Contract Number:
- AT(30-2)-GEN-16
- NSA Number:
- NSA-18-007035
- OSTI ID:
- 4119754
- Report Number(s):
- BNL-7492
- Country of Publication:
- United States
- Language:
- English
Similar Records
COOL-DOWN REFRIGERATION REQUIREMENTS FOR 80'' BUBBLE CHAMBER
80'' BUBBLE CHAMBER EXPANSION SYSTEM. PRELIMINARY OPERATING PROCEDURES
80'' BUBBLE CHAMBER EXPANSION SYSTEM. SUMMARY OF PISTON MOTION STUDIES, OCTOBER-NOVEMBER 1962
Technical Report
·
Sun Jan 24 23:00:00 EST 1960
·
OSTI ID:4142912
80'' BUBBLE CHAMBER EXPANSION SYSTEM. PRELIMINARY OPERATING PROCEDURES
Technical Report
·
Wed Apr 10 23:00:00 EST 1963
·
OSTI ID:4118853
80'' BUBBLE CHAMBER EXPANSION SYSTEM. SUMMARY OF PISTON MOTION STUDIES, OCTOBER-NOVEMBER 1962
Technical Report
·
Fri Oct 30 23:00:00 EST 1964
·
OSTI ID:4118875