80'' BUBBLE CHAMBER EXPANSION SYSTEM. PRELIMINARY OPERATING PROCEDURES
Technical Report
·
OSTI ID:4118853
Procedures are presented for the initial operation of the expansion system and for use as a basis for more complete procedures. The procedures cover the following: initial evacuation and purging of the system with hydrogen, setting up operating pressures on the floor control panel, filling valves and reservoirs to operating pressure, filling chamber, buffer volume, and cylinder head to operating pressure, shutting down the system, disassembling the boot valves during operation, disassembling the solenoid valves during operation, and initial operation. (D.L.C.)
- Research Organization:
- Brookhaven National Lab., Upton, N.Y.
- DOE Contract Number:
- AT(30-2)-GEN-16
- NSA Number:
- NSA-18-007036
- OSTI ID:
- 4118853
- Report Number(s):
- BNL-7493
- Country of Publication:
- United States
- Language:
- English
Similar Records
80'' BUBBLE CHAMBER EXPANSION SYSTEM. SUMMARY OF PISTON MOTION STUDIES, OCTOBER-NOVEMBER 1962
DESIGN CONSIDERATION FOR 80'' BUBBLE CHAMBER
Natural gas sampling procedures and techniques
Technical Report
·
Fri Oct 30 23:00:00 EST 1964
·
OSTI ID:4118875
DESIGN CONSIDERATION FOR 80'' BUBBLE CHAMBER
Technical Report
·
Wed May 11 00:00:00 EDT 1960
·
OSTI ID:4119731
Natural gas sampling procedures and techniques
Conference
·
Sun Dec 31 23:00:00 EST 1978
· 26th Univ. Kansas Heart American Gas Meas. Inst. Annual Meeting Selected Paper; (United States)
·
OSTI ID:5502479