ABWR QUARTERLY PROGRESS REPORT, JANUARY 1, 1960-MARCH 31, 1960. VOLUME III. ABWR DESIGN AND DEVELOPMENT
Technical Report
·
OSTI ID:4091342
The current Army Boiling-Water Reactor program is reviewed. Plant design, core analysis, reactor theory development, and health physics studies are discussed for the Portable Low-Power Plants (PL-1 and PL-2). Plans for installing a PL-2 plant in a snow tunnel at Byrd Station in Antarctica are described. (B.O.G.)
- Research Organization:
- Combustion Engineering, Inc. Nuclear Div., Windsor, Conn.
- NSA Number:
- NSA-15-010499
- OSTI ID:
- 4091342
- Report Number(s):
- CEND-83(Vol.III); IDO-19013(Vo
- Country of Publication:
- United States
- Language:
- English
Similar Records
ABWR DESIGN AND DEVELOPMENT QUARTERLY PROGRESS REPORT, JANUARY 1 THROUGH MARCH 31, 1962
ABWR--PL-2 DESIGN REPORT, OCTOBER 15, 1960
ABWR QUARTERLY PROGRESS REPORT FOR JULY 1 TO SEPTEMBER 30, 1959. Oct. 15, 1959. VOLUME I. SL-1 OPERATION AND EVALUATION. VOLUME II. SL-1 HEALTH PHYSICS AND SAFETY. VOLUME III. ABWR DESIGN AND DEVELOPMENT
Technical Report
·
Sat Apr 14 23:00:00 EST 1962
·
OSTI ID:4776542
ABWR--PL-2 DESIGN REPORT, OCTOBER 15, 1960
Technical Report
·
Tue Oct 30 23:00:00 EST 1962
·
OSTI ID:4772429
ABWR QUARTERLY PROGRESS REPORT FOR JULY 1 TO SEPTEMBER 30, 1959. Oct. 15, 1959. VOLUME I. SL-1 OPERATION AND EVALUATION. VOLUME II. SL-1 HEALTH PHYSICS AND SAFETY. VOLUME III. ABWR DESIGN AND DEVELOPMENT
Technical Report
·
Sun Oct 30 23:00:00 EST 1960
·
OSTI ID:4225409