Xenon Transient Tests: Core I, Seed 2, 149.8 EFPH: Section 1 - Test Results T-612081
A test was made to determine if there is sufficient excess reactivity in the core to override a peak xenon transient and to obtain data for rod worth calculations. After 149.8 EFPH's of plant operation on seed 2, there was sufficient excess reactivity to override peak xenon. Criticality during peak xenon was maintained with group III and group IV rods inserted, group I rods withdrawn to approximately 69 in., and group II rods withdrawn to approximately 29 in. The override of peak xenon occurred 8 hours and 45 min after shutdown.
- Research Organization:
- Duquesne Light Co., Shippingport, PA (United States)
- Sponsoring Organization:
- USDOE National Nuclear Security Administration (NNSA), Nuclear Criticality Safety Program (NCSP); US Atomic Energy Commission (AEC)
- NSA Number:
- NSA-15-010509
- OSTI ID:
- 4091338
- Report Number(s):
- DLCS-1560107
- Country of Publication:
- United States
- Language:
- English
Similar Records
XENON TRANSIENT TESTS. CORE I, SEED 2, EFPH 1565.4. Section 1. Test Results T-612081
XENON TRANSIENT, 761.3 EFPH. CORE I, SEED 2. Section 1. Test Results T- 612081
Test Results: DLCS 1560103 T-612061 Xenon Transient 2790.5 EFPH - Core I, Seed I
Technical Report
·
Sun Jan 29 23:00:00 EST 1961
·
OSTI ID:4030823
XENON TRANSIENT, 761.3 EFPH. CORE I, SEED 2. Section 1. Test Results T- 612081
Technical Report
·
Wed Nov 30 23:00:00 EST 1960
·
OSTI ID:4065421
Test Results: DLCS 1560103 T-612061 Xenon Transient 2790.5 EFPH - Core I, Seed I
Technical Report
·
Wed Apr 26 23:00:00 EST 1961
·
OSTI ID:4073931
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
CONTROL ELEMENTS
CRITICALITY
Calculations
Criticality
EFPH
Nuclear Criticality Safety Program (NCSP)
Override
POISONING
REACTIVITY
REACTOR CORE
RODS
Reactor
Reactor Core
SHIPPINGPORT
SHUTDOWN
Shippingport
Shutdown
Test
Test Results
Testing
XENON
Xenon
CONTROL ELEMENTS
CRITICALITY
Calculations
Criticality
EFPH
Nuclear Criticality Safety Program (NCSP)
Override
POISONING
REACTIVITY
REACTOR CORE
RODS
Reactor
Reactor Core
SHIPPINGPORT
SHUTDOWN
Shippingport
Shutdown
Test
Test Results
Testing
XENON
Xenon